The rule
The band comes first; the score arrives into it.
The structural health verdict works because a composite of a given magnitude means a fixed thing that was decided in advance. The ordering is the entire safeguard. If the bands are published first, a score of 62 is a fact about the month. If they are set afterwards — even with complete honesty, even by an operator genuinely trying to be fair — 62 becomes whatever the month needs it to be, because the person setting the band already knows what happened and cannot un-know it. This is not a claim about integrity. It is a claim about the impossibility of judging a standard neutrally once the result is in hand.
| step | bands first | score first |
|---|---|---|
| 1 | thresholds published | month scored: 62 |
| 2 | month scored: 62 | thresholds chosen |
| 3 | verdict follows | verdict already decided |
| result | the month is judged | the standard is judged |
The arithmetic is identical in both columns. Only the sequence differs, and the sequence is what determines whether the number constrains the operator or the operator constrains the number.